News

FIB prize for Yavuz Sultan Selim bridge

The Yavuz Sultan Selim Bridge (3rd Bosphorus Bridge) has been awarded FIB Outstanding Concrete Structure Exceptional  Recognition presented at the 2018 FIB congress in Melbourne, Autralia.

Continue Reading

Lanciau Bridge is open

On June 5th, the rail bridge on the MOB line in the town of Rossinière was displaced sideway to its final location. This railway bridge, made in spatial tubular structure, is the first of its kind in Switzerland.

Continue Reading

Open to Traffic !

Work is done 

The end of an incredible adventure !

On the 26th of August, an impressive opening ceremony, in presence of the president Recep Tayyip Erdogan, several President of foreign countries and all the goverment, the bridge has been open to traffic

DSC 0083

Continue Reading

About us

Learn more

Contact